The Ottumwa Courier

April 23, 2014

Fiber optic installation begins Monday


Ottumwa Courier

---- — OTTUMWA — Motorists are advised that Lisco/LTDS will be installing conduit for fiber optic cable on Mary Street from Bruce Street to South Milner Street starting Monday.

This project should be completed within 10 working days, depending on weather. Drivers should be prepared for work zone driving conditions along the Mary Street corridor. Workers and equipment will be on the street and in the right-of-way. Flaggers will be used, as needed, to assist with the traffic flow.